Company Profile
JinWei Industry Co., Limited (Simply: JW Mold) is located in Dongguan city, Guangdong Province, the south of China. there is 60 minutes drive from Shenzhen International Airport or 90 minutes.
we can provide one-stop service from design & development, mold fabrication, plastic parts injection and assembly.we have own workshop mold making, precision machining, and molding production the following are our services and advantages :
---- Product design & development. Quick prototype
---- Mold design, DFM, Moldflow .these reports can be done in RFQ stage if necessary, will not pursue for order or cost
---- Mould fabrication, sampling and worldwide delivery under terms FOB, DAP, DDP.
In past 11 years, there were 1070 set plastic injection tools built-in our here for a variety of industries include Automotive, home appliances, Electronics...also many technical or precision tools .the end customers include Lear, Stihl, GM, VW, B/S/H ..etc
JW team can Provide customer full Engineering support from free Estimation and analysis, fabrication to project completion. Reply emails in 24 hours Maximum. JW Mold is Capable to build over 110 tools a year from small Electronic product tools to big complex Automotive parts, Currently building mold within 80- 7500KG. there will more machines available in the year 2020
Jimmy Tang is the owner of this company, before create JW mold, he had been working for 3 of Top 10 famous mold makers in the south of China for more than 12 years totally, most of the time worked in sales dept as Marketing or Project Manager. Therefore Jimmy and his team have deep understanding in USA and European tool standards, as well as their concerns on Quality, lead time, price and Service.
Partner
Full customer oriented, 12 Years No Change
CAD/CAM/ CAE Capability
Using UG NX7- NX10 for tool design and CNC programming. Autocad to create 2D drawings. Autodesk 2013 for mold flow simulation. The Customer,s data format can be in step, Catia, Pro-E, X-T, Igs, Solidworks, No problem for JW to convert the file.
The Product Design and feasibility study will be performed by experienced designers, submit the report in PPT document With issues and proposals. Also, provide a modified 3D model with DFM together for approval. Afterward, the tool design will be complete in 3D format. The 2D assembly drawings are follow up after 3D design finalized
Mold Flow Analysis
Always within 1-2 days
DFM Report
Complete in 1-2 days
Mold Design
Finish in 0.5-1.5 weeks depends on complexity